The council wants to light the main paths through Kidwells Park and Town Moor in Maidenhead. Its consultation is open until Monday 28 December.

The council wants to put lights along the main paths through Kidwells Park and Town Moor in Maidenhead, and is asking people who use them what they think. The consultation opened on Monday 16 November and closes on Monday 28 December.

The two parks carry walking and cycling routes between north Maidenhead and the town centre. The council says they “can feel dark and less welcoming after sunset” in autumn and winter (consultation page).

Overview

  • What: new lights along the main paths in Kidwells Park and on Town Moor.
  • How many: the scheme drawings schedule 24 lights in Kidwells Park and 12 on Town Moor.
  • Paid for by: the government’s Active Travel England Integrated Transport Fund.
  • Have your say: online, by email or by post, until Monday 28 December.

What is proposed

The council’s two plans mark where each light would go. In Kidwells Park they follow the paths past the playgrounds, the tennis courts and the skate park (Kidwells Park plan). On Town Moor they run along the diagonal path across the open grass and around the Town Moor building, with a mix of single, back-to-back and lower lights (Town Moor plan).

The engineering drawings give the detail:

  • 24 lights on the Kidwells Park sheet and 12 on the Town Moor sheet (drawing 1, drawing 2).
  • Each sits on a 5-metre grey steel column.
  • The lanterns are LED, in a warm white (3,000K).
  • Most are full cut-off fittings, which keep the light pointing down.

The Kidwells Park plan labels the points “replacement street lights”, while the council’s announcement describes “additional light fixtures”. The consultation page does not say how many lights are there now.

The council says it has taken account of wildlife, and that light levels will be monitored. The new lights would follow the park’s existing lighting schedule (council announcement). The scheme adds to work already under way in Kidwells Park, including the refurbishment of the skate park.

What the council says

Cllr Geoff Hill, Cabinet Member for Highways, said the council had “already heard from the community that Kidwells Park and the surrounding area needs more light cover”.

“Adding lights through the main park pathways means residents and visitors will be able to do the things they enjoy for longer in the darker months while also staying safe and secure,” he said.

What it means for you

If you walk or cycle through either park, this is the time to say whether the lights are in the right places. The council says the survey takes under five minutes, and the responses will decide whether the scheme goes ahead and what changes it needs.

  • Online: the survey is on the consultation page.
  • In person: the plans and paper surveys are at Maidenhead Library.
  • By email: Activetravel@RBWM.gov.uk
  • By post: Transport Policy Manager, Royal Borough of Windsor & Maidenhead, Town Hall, St Ives Road, Maidenhead SL6 1RF.

Paper surveys must go back by post. The council says not to leave them at the library or any other council building, or they may not be counted.

The consultation closes on Monday 28 December 2026.