No trains between Slough and Paddington 27 December to 3 January; SWR's last Waterloo train on Christmas Eve is about 10pm. Every Windsor date, both lines.

No trains will run anywhere in Britain on Christmas Day, Friday 25 December 2026, and most operators will run nothing on Saturday 26 December either. Services on Christmas Eve and New Year’s Eve will finish earlier than usual (National Rail).

GWR has now published its Christmas engineering. No trains will run between Slough and London Paddington from Sunday 27 December to Sunday 3 January, and Paddington is also closed to all trains on the weekend of 28 and 29 November. The Slough to Windsor & Eton Central shuttle keeps running throughout (GWR). Our full report has each date and the replacement buses.

South Western Railway, which runs Windsor & Eton Riverside’s trains to Waterloo, has published its festive plan too. The last train from London Waterloo on Christmas Eve leaves around 10pm, nothing runs on 25 or 26 December, and suburban routes run a reduced service on 27 and 28 December because of engineering in the Wimbledon area (SWR).

Updated 17 October: South Western Railway’s Christmas and New Year service added for the Waterloo line. GWR’s Paddington closures for 28 and 29 November and 27 December to 3 January were added on 3 October.

Overview

  • Christmas Day: no trains at all. Boxing Day: very few, and none on SWR’s Waterloo line.
  • Boxing Day bank holiday moves to Monday 28 December. SWR runs a reduced suburban service; GWR’s Paddington line is shut east of Slough that day.
  • Paddington line: no trains between Slough and Paddington, 27 December to 3 January. Replacement buses run from Slough. The Windsor & Eton Central shuttle to Slough keeps running.
  • Paddington closed on Saturday 28 and Sunday 29 November as well.
  • Waterloo line (Riverside): last train from Waterloo about 10pm on Christmas Eve. No SWR trains on 25 or 26 December. A later start and reduced suburban service on 27 and 28 December, a Saturday service on 29 and 30 December, and the last train from Waterloo before midnight on New Year’s Eve.

Windsor’s lines at Christmas

Windsor has two stations on two different railways, so check both.

  • Windsor & Eton Central is the Great Western Railway shuttle from Slough, where you change for Paddington or the Elizabeth line.
  • Windsor & Eton Riverside is South Western Railway’s direct line to London Waterloo through Datchet and Staines.
  • Maidenhead has GWR and the Elizabeth line to Paddington, so it shares the Paddington line’s works.

Normal journey times and fares are on our Windsor train times to London page.

South Western Railway day by day (Waterloo line)

SWR’s Christmas page sets out the network-wide pattern below. It does not yet list Windsor trains one by one, and it says the page “will be updated with more details in due course” (SWR).

Date What SWR says
Thu 24 Dec Services end earlier; last train from London Waterloo around 10pm
Fri 25 and Sat 26 Dec No services on the SWR network
Sun 27 Dec Later start, first train from Waterloo at 6.14am; reduced suburban service
Mon 28 Dec (bank holiday) Reduced suburban service; buses between Clapham Junction, Earlsfield, Wimbledon and Surbiton; Twickenham busier because of rugby
Tue 29 and Wed 30 Dec A Saturday service across the network
Thu 31 Dec Services end earlier; last train from Waterloo before midnight; queuing at Waterloo for the fireworks
Fri 1 Jan Extra trains from Waterloo between 1am and 4.45am, then services resume at 6.20am
Sat 2 and Sun 3 Jan Most services run as usual
Mon 4 Jan Normal service

The replacement buses on 28 December are on the Wimbledon side of the network, not on the Windsor line, which runs from Waterloo through Clapham Junction, Richmond, Twickenham and Staines. Windsor trains still pass through Twickenham, where SWR says services will be busier than usual on the rugby day, with a queuing system at the station after the match. SWR says its journey planners are up to date to Monday 4 January 2027, so check the individual train before you travel.

National Rail’s framework for 2026/27

National Rail’s festive guide covers Thursday 24 December 2026 to Monday 4 January 2027 (National Rail).

Date What National Rail says
Thu 24 Dec Earlier finish on many routes. Last-train guide due late November or early December
Fri 25 Dec No National Rail services
Sat 26 Dec Most operators run nothing; a very limited service by a few, to be confirmed
Mon 28 Dec Substitute Boxing Day bank holiday; services to be confirmed
Thu 31 Dec Earlier finish on some routes
Fri 1 Jan Some London routes run special trains after midnight; guide due early December

Operator pages for GWR, the Elizabeth line and SWR will be filled in “from the beginning of October onwards”. GWR’s own Christmas page still carried last year’s holding notice when we checked on 25 September (GWR).

What happened last Christmas, 2025/26

These were last year’s works, not this year’s. They show the kind of disruption Windsor travellers should plan for.

  • Waterloo line. Network Rail announced on 6 October 2025 that no trains would call at London Waterloo on Saturday 27 and Sunday 28 December 2025, with trains ending at Clapham Junction, then reduced timetables until 4 January 2026, while track near Queenstown Road was renewed (Network Rail).
  • Paddington line. On 21 October 2025 Network Rail said track renewal would leave only two of the four tracks into Paddington open from 27 December to 4 January, with an amended and busier timetable (Network Rail).
  • The year before was worse. At Christmas 2024 no trains called at Paddington from 24 to 29 December, and services turned back at Reading and Ealing Broadway (Network Rail).

Already booked for December 2026

National Rail’s engineering list runs about twelve weeks ahead, so it reaches mid-December but not Christmas yet. Two jobs on the Paddington line are already listed:

  • Saturday 5 and Sunday 6 December: two of four lines shut between Hayes & Harlington and Slough. Elizabeth line and GWR trains run an amended service, and before 8am on the Sunday buses replace trains between Hayes & Harlington and Slough (National Rail).
  • Wednesday 16 to Friday 18 December, very early mornings: buses replace trains between Slough and Burnham or Taplow (National Rail).

Roads and parking

Road closures across the borough are updated weekly on our roadworks and travel page, and car park prices and the park and ride are on parking in Windsor. The council has not yet announced any Christmas parking offer for 2026.

Still to be confirmed

The exact Windsor & Eton Riverside last trains on Christmas Eve and New Year’s Eve, GWR’s Christmas Eve last trains and New Year’s Eve late trains (late November to early December), the Boxing Day and 28 December services, bus operators’ festive timetables and any council parking concession. We will update this page as each is published.